Contact Us

TPS54218RTER

Brand: Texas Instruments
Texas Instruments TPS54218RTER is a power management component designed for AI Servers & Low-Altitude Economy (Drone and UAV) and related applications. In stock at Superb Automation — request a quote for competitive pricing and fast delivery.
quote now

Product Specifications

TPS54218RTER — Power Management & Signal Chain | Superb Automation

TPS54218RTER

Texas Instruments — Power Management & Signal Chain

Product Overview

The TPS54218RTER from Texas Instruments is a power management / signal chain IC delivering high efficiency, precision regulation, and robust protection. Texas Instruments (TI) is a global leader in analog ICs, power management solutions, and embedded processors.

Superb Automation partners with leading brands including Qorvo, TI, ADI, XILINX, NVIDIA, Intel, ST, MACOM, Renesas, and Coilcraft to provide complete BOM and supply-chain solutions.

Key Features

  • High-efficiency power conversion with low quiescent current
  • Wide input voltage range with precision output regulation
  • Integrated over-current, over-temperature, and short-circuit protection
  • Small footprint packaging for space-constrained designs
  • AEC-Q100 qualified options available for automotive applications
  • Flexible sequencing and soft-start control

Key Specifications

Input VoltageV
Output VoltageV
Output CurrentA
Switching FrequencykHz
Efficiency%
Quiescent CurrentµA
Topology—
Package—
Operating Temp°C
Protection—

Applications

Industrial Automation Automotive Electronics Telecom Infrastructure Server & Data Center Power Medical Devices Consumer Electronics

Request Quote — In Stock, 100% New & Original, Full Warranty

TPS54218RTER: 2 A synchronous step down for 5 V and 3.3 V intermediate rails

TPS54218RTER is a current mode synchronous step down converter with both switches integrated in a WQFN body of 16 pins. Both switches are inside the body at 30 mOhm typical, so a 2 A rail needs one inductor, two capacitors and a handful of passives. The switching frequency runs from 200 kHz to 2 MHz, which lets a build trade inductor size against loss, and the reference holds 1 per cent over the full junction range rather than only at room temperature.

Order code and package

TPS54218RTERactive, production, WQFN 16 pins, 3000 pieces on a large reel
TPS54218RTERG4green row, same body and same reel size
Marking54218 on the top side
Moisture levelLevel 2, 260 C, one year floor life
Temperatureminus 40 to 150 C junction
Thermal50 C per watt junction to ambient on a JEDEC high K board, 37 C per watt junction to case

Electrical parameters that decide the application

Input voltage2.95 V to 6 V operating, 7 V absolute maximum
Output current2 A continuous
Switching frequency200 kHz to 2 MHz, 400 to 500 kHz with a 400 kOhm timing resistor
Reference0.8 V nominal, 0.795 V to 0.803 V over minus 40 to 150 C
Switch resistance30 mOhm typical high side and low side
Supply current350 uA typical operating, 2 uA in shutdown
Lockout2.6 V internal, raisable with a divider on the enable pin
Current limit2.9 A to 3.6 A instantaneous peak, cycle by cycle
Power goodwindow between 93 and 107 per cent of nominal
Thermal shutdown175 C

Family variants and how they differ

Frequency settinga resistor from RT/CLK to ground, or an external clock through the same pin
Soft starta capacitor on SS sets the ramp and the inrush
Enable dividertwo resistors raise the lockout above the internal 2.6 V
Boot capacitor0.1 uF from BOOT to PH, refreshed every cycle
Compensationexternal on the COMP pin, current mode so a type two network is enough
Package3 mm by 3 mm with the thermal pad tied to ground through vias

Points to check before this part goes on a BOM

The current limit window sits at 2.9 A to 3.6 A against a 2 A rating. That is a deliberate margin, not a 5 A part in disguise: the window is an instantaneous peak figure and the inductor saturation current has to sit above the 3.6 A top of the window, which is the number that sizes the inductor, not the 2 A load.

The internal lockout is 2.6 V. On a 3.3 V rail that leaves only 700 mV of headroom, so a supply that sags during a hot plug restart will drop the rail rather than ride through it. A divider on the enable pin sets a higher threshold and about 100 mV of hysteresis.

The boot capacitor is refreshed while the low side switch is on. At very high duty cycle, near dropout, the low side on time gets short enough that the boot lockout engages and the output is forced off until the capacitor is refreshed, so a 5 V to 3.3 V rail run at 2 MHz has less headroom than the same rail at 500 kHz.

Power good is an open drain output with a 10 mA sink rating. It needs a pull up to a rail that is present before the converter starts, otherwise the signal is only valid after the output is already up and the sequencing it was meant to provide is lost.

The soft start capacitor sets both the ramp and the behaviour into a precharged output. The part is specified for safe start up into a prebiased node, which matters on a board where a second regulator holds the same rail up briefly during a restart.

Frequency foldback lowers the switching frequency during an overcurrent event instead of holding it, which extends the on time and shortens the off time until the current falls. The audible effect on a ceramic output capacitor can be noticeable but the die stays inside its thermal window.

Ambient is not the rating here. The 150 C figure is junction temperature with the thermal pad soldered to a copper area, so the 50 C per watt figure assumes the pad is tied down with vias and not left floating on a signal layer.

Choosing the frequency

At 2 MHz the inductor can drop to about 1.5 uH for a 1.8 V rail at 2 A, which is what makes a 12 mm by 12 mm solution possible. The cost is switching loss: the same rail at 500 kHz uses a 6.8 uH inductor and runs several points higher in efficiency at full load.

The crossover between the two is usually around 1 A of load. Below that, the higher frequency part wins on size and the lower one wins on light load current, because the supply current of 350 uA is fixed and the switching component scales with frequency.

What the reference tolerance means in a real rail

A 1.8 V rail built from a 0.8 V reference and a divider carries the reference window plus the resistor tolerance plus the feedback leakage of 100 nA. With 1 per cent resistors the total lands near 1.4 per cent before temperature, which is why a rail that must hold 1.8 V plus or minus 1 per cent at the load needs 0.1 per cent resistors or a different reference.

The 0.795 V to 0.803 V window is tighter than the 1 per cent headline suggests, because 1 per cent of 0.8 V is 8 mV and the window is exactly that. Read the two figures as the same statement made twice.

Sequencing against a 3.3 V rail

A 2 A rail that feeds a processor usually has to come up after the 3.3 V housekeeping rail. The enable pin is a comparator input with 100 nA of leakage, so a divider from the 3.3 V rail with a 47 kOhm top leg and a 10 kOhm bottom leg turns the part on near 2.7 V and off again near 2.55 V, which is a clean 100 mV of hysteresis and well clear of the internal 2.6 V lockout.

The soft start capacitor then sets the ramp. The vendor revision note works an example with 10 nF giving 4.3 ms, which is long enough that a 100 uF output bank charges at about 40 mA above the load instead of hitting the 2.9 A limit and folding the frequency back at every power up.

Where this order code fits

Buyers pull this part for intermediate rails behind a 5 V or 12 V bus in industrial control, broadband line cards and wireless infrastructure hardware. Teams comparing it with a neighbouring part start from our Power Management Cross Reference page, and teams replacing a part that has gone end of life start from the How to Verify a Drop in Replacement page.

Questions buyers ask

Can it run from a 3.3 V rail? Yes, with 3.3 V in and 1.8 V out at 2 A. The lockout at 2.6 V leaves little margin for a sagging supply, so the enable divider is worth setting higher than the internal threshold.

Is the compensation fixed? No. The COMP pin is brought out and a type two network sets the crossover. A rail built with the vendor values for 1.8 V out will be stable, and one built with the values for 5 V out at the same frequency will ring.

What is the minimum on time? Short enough for a 0.8 V output from a 6 V input at 2 MHz, which is a duty cycle near 13 per cent. Below that the part skips pulses rather than forcing the on time shorter.

Does it need a minimum load for regulation? No. It switches continuously and the output stays in regulation at no load, with the supply current rising to about 350 uA.

SUPERB holds and sources this line for production and repair demand, quoted against the exact ordering string with date codes, packing and country of origin stated on the offer. When a part is moving, the BOM Shortage Recovery page sets out the checks that keep a substitute from failing on the bench.