The controller reads voltage and current, works out the reactive power and closes the step that brings the power factor back to target. Outputs run from 3 to 12 relay steps, with a 1 A or 5 A current input and a C/k setting that follows the smallest step. Alarm contacts cover overvoltage, undervoltage, over temperature and a target that is not reached. The switching sequence is what separates a good bank from a chattering one, and it is set per installation.
quote now

Product Specifications

Product Overview

An automatic bank is only as good as the device that decides which step closes. The controller samples voltage and current, computes the reactive power of the load, and compares it with the target power factor. When the difference is larger than the smallest step, it closes one step and waits for the delay to expire before it looks again. Everything that goes wrong in a compensation panel traces back to one of those three settings: the current transformer ratio, the C/k value that follows from it, and the delay between two switchings.

The C/k setting is where most commissioning errors sit. It is the reactive power of the smallest step divided by the current transformer ratio, and a controller fed a C/k that is too small will hunt, closing and reopening steps around the target. The better units measure C/k themselves on the first few switchings and store it, which removes the arithmetic from the commissioning sheet. A controller that cannot do that needs the value from the table on this page.

The second decision is the switching sequence. A bank built as 1:1:1:1 resolves the load in equal steps and switches often. A 1:2:4:8 bank reaches any value with four steps and switches less, but a failed large step leaves a hole that the small steps cannot fill. A circular sequence distributes wear across the steps, and a controller that mixes integral and direct switching keeps the count down on a load that drifts slowly and jumps occasionally.

Key Specifications

ParameterValueNote
Functionmeasure V and I, compute reactive power, switch capacitor stepstarget power factor is set on the front panel
Relay outputs3, 6, 8, 10 or 12 stepsone output per step, potential free contact
Operating voltage100 to 440 V AC, 690 V version availablesupply and measurement from the same terminals on most types
Current inputX/5 A standard, X/1 A on some typescurrent transformer class 1, 10 VA or better
C/k setting0.01 to 3 A, with automatic measurement0.05 to 1 A on the Varlogic NR types
Target power factor0.7 inductive to 0.7 capacitive0.85 inductive to 0.9 capacitive on the NR types
Step delay1 to 999 s, programmable10 to 600 s on the NR types, 10 to 900 s on NRC12
Switching sequences1:1:1, 1:2:2, 1:2:3:3, 1:2:4:4, 1:2:4:8 and mixedcustom sequence on the NRC12
Measurement displayedvoltage, current, power factor, THD of voltage and current, active and reactive powerharmonics to the 31st order on the metering types
Alarm contact5 A at 250 V ACone contact, shared by the alarm list
Protectionovervoltage, undervoltage, over temperature, target not reachedall steps are removed on overvoltage
CommunicationRS485 Modbus on the NRC12 typeoptional module, others are front panel only
Mountingpanel cut out 138 x 138 mm, or 35 mm DIN rail144 x 144 mm front, 80 mm deep
Front protectionIP40, IP41 on the NR typesrear of the unit sits inside the enclosure
Ambient temperature-10 to +60 C in operationdisplay contrast compensated over the range
StandardsIEC 61010-1, IEC 61326CE marked

Included Models and Order Codes

The ABB RVC range is ordered by the number of outputs, and the code follows the step count rather than the voltage: RVC-3 has three outputs, RVC-12 has twelve, and the operating voltage is set by the type within the range. The Schneider Varlogic NR6 and NR12 take six and twelve steps with a 5 A current input, and the NRC12 adds harmonic analysis, a second target power factor and RS485 Modbus. Where a controller is specified as a replacement, the step count and the current transformer ratio decide the type, and the coil voltage of the contactors decides nothing about the controller.

TypeStepsCurrent inputOrdering code and notes
ABB RVC-33X/5 A or X/1 A2GCA294983A0050, 400 V types only
ABB RVC-66X/5 A or X/1 A2GCA294984A0050
ABB RVC-88X/5 A or X/1 A2GCA294985A0050
ABB RVC-1010X/5 A or X/1 A2GCA294986A0050
ABB RVC-1212X/5 A or X/1 A2GCA294987A0050, full voltage range
Schneider Varlogic NR66X/5 Atype code only, 10 to 600 s step delay
Schneider Varlogic NR1212X/5 Atype code only, 65 x 21 mm display
Schneider Varlogic NRC1212X/5 A or X/1 Aharmonic spectrum, dual target, RS485 Modbus option

C/k Value for a 400 V Network

C/k is the reactive power of the smallest step divided by the current transformer ratio, and the controller needs it before the first switching. The rows below follow the formula used in the ABB manual, 0.62 times step kvar times 1000 divided by line voltage and CT ratio. A 25 kvar smallest step on a 400/5 transformer gives 0.97, and the same step on a 200/5 transformer gives 0.19, which is why the transformer ratio has to be known before commissioning starts.

Smallest stepCT 20/5CT 40/5CT 60/5
10 kvar0.780.390.26
12.5 kvar0.970.480.32
25 kvar1.940.970.65
50 kvar3.881.941.29

Key Features

Step count matched to the bank – 3, 6, 8, 10 and 12 output types are listed with their codes, so a twelve step bank is not ordered a six step controller with a note to expand later.

C/k measured or entered – the setting range and the arithmetic are on the page, because a controller that hunts is almost always a controller with the wrong C/k.

Sequences per load – equal, binary and mixed sequences are selectable, and the sequence is what decides how often the largest step is switched.

Alarms that mean something – overvoltage and over temperature remove the steps, while a target that is not reached after all steps closed points at the bank rather than at the controller.

1 A and 5 A current inputs – both secondary currents are offered, so a controller can sit on a metering transformer or on a dedicated 1 A core.

Modbus where it is needed – the NRC12 carries RS485 Modbus, which is enough for a building management link without adding a gateway at the panel.

Panel and DIN rail mounting – the same unit fits a 138 x 138 mm cut out or a 35 mm rail, which matters when a bank is retrofitted into an existing door.

Applications

The controller is chosen on the bank it drives, and three bank shapes cover most of the orders we quote.

Plant room banks with six to twelve steps – the load drifts over the day, so a binary or mixed sequence reaches the target with fewer switchings than an equal step bank.

Banks behind detuned reactors – the controller sees the reactor current rather than the capacitor current, and the C/k value has to be set on the step that the reactor passes.

Retrofit panels with a 1 A metering core – an existing 1 A transformer can feed the controller directly where a 5 A only type would need the core replaced.

The controller is often quoted with the panel it sits in, so the SUPERB PCBA and the SUPERB PCB are checked against the same step list and the CT wiring is reviewed once for both.

Sourcing and Cross-Reference

A controller replacement is usually urgent, because the bank either hunts or sits with all steps out. The first check is the step count on the drawing, the second is the current transformer ratio printed on the core, and the third is the coil voltage of the contactors, which the controller does not care about but the output card does. A 12 output unit will drive a 6 step bank, but the spare outputs will be configured off and the step list has to be shortened on the front panel.

The second check is the display language and the firmware generation. A unit from an older batch may not accept a 1 A input even where the current range does, and a Modbus option cannot be added to a unit that was built without the port. Where the original type is no longer supplied, the honest answer is the next type up in the same family rather than a unit from another maker with a different terminal layout.

For a bank waiting on a controller, the options are the same step count in another family, a higher step count with the extra outputs configured off, or a used unit where the firmware matches. See lead time and availability for a specific type, and obsolete part cross reference where the original controller has been withdrawn.

The SUPERB Assembly team labels every step output and leaves the C/k value on the commissioning sheet, because a controller without that number will hunt on the first day.

Q: Can you confirm the step count and the C/k setting for our bank before we replace a controller that keeps hunting?

A: Yes. Send the step count, the smallest step in kvar, the current transformer ratio and the contactor coil voltage, and the SUPERB Tech team returns the type and the settings that fit.

Why Compensation Panel Builders Source Controllers Through SUPERB

  1. Step count and code together: every ABB row carries its ordering code, so a twelve output unit is quoted as a twelve output unit and not as a family name.
  2. C/k arithmetic on the page: the table converts a smallest step and a transformer ratio into the setting the controller expects, which is where most commissioning time is lost.
  3. Alarm behaviour stated: overvoltage, over temperature and target not reached are separated, because only one of them means the controller itself is at fault.
  4. Replacement path named: where a type is withdrawn, the next type in the family and the cross reference hub are offered instead of a substitute from another maker.

Related Product Families

This page is part of the component range we supply for industrial, telecom, medical and defence builds. Continue with: Power Factor Correction Capacitors for Panel Compensation, Capacitor Switching Contactors for Power Factor Correction, Detuned Reactors and Harmonic Filters for Capacitor Banks, Thyristor Switches for Capacitor Bank Switching, Multifunction Power Meters and Power Quality Analyzers, DIN Rail kWh Meters for Panel Energy Monitoring.