Thyristor Switches for Capacitor Bank Switching
Product Specifications
Product Overview
A capacitor closed by a contactor is a short circuit for the first few milliseconds. The step already energised discharges into the one closing, and the peak runs to 100 or even 200 times the rated current. Contacts weld, the capacitor ages early and the network sees a voltage transient. A thyristor switch removes that event rather than damping it: the pair is fired at the current zero crossing, so the capacitor charges from zero and the current rises to its normal value without a peak.
The second difference is mechanical life. There are no contacts to burn, so switching operations are not the limit any more. A step can follow a welding line, a press or a crane that changes load several times a minute, which is where a contactor based bank reaches its cycle count inside a year. The trade is loss and heat: two thyristors in conduction drop about 1.5 V each, and that loss has to leave the enclosure.
What separates one module from another is not the kvar figure alone. Voltage class decides whether a 480 V or 690 V network can be served, the control interface decides whether the module takes a 12 to 24 V DC trigger from the controller or a system bus, and the monitoring decides what a maintenance team sees before a step fails. The module is self observing: it checks the supply, the phase sequence and the capacitor output, and it reports a fault on its display and through a contact.
Key Specifications
| Parameter | Value | Note |
|---|---|---|
| Switching element | back to back thyristor pair per phase | phase angle controlled, fired by the module itself |
| Switching instant | current zero crossing | no inrush peak and no voltage transient on closing |
| Reaction time | 5 ms | module reacts on the trigger edge, not on the next mains cycle |
| Rated voltage | 3 x 380 to 440 V AC | 480 V and 690 V versions on the N480 and N690 types |
| Capacitive load per module | 10 to 100 kvar | single phase module covers 10 to 22 kvar |
| Switching operations | not limited by contacts | the capacitor life is the limit, not the switch |
| Control input | 12 to 24 V DC trigger | system bus trigger on the TSM-LC-S types |
| Monitoring | supply voltage, phase sequence, capacitor output, temperature | fault shown on the module display |
| Fault signalling | potential free contact through an annunciation unit | 30 V DC 1 A or 230 V AC 1 A on the ABB module |
| Cooling | natural convection, forced fan option | 150 mm clearance above the module for ventilation |
| Degree of protection | IP20 | module sits inside the panel, busbars behind a cover |
| Series reactor | 5.7 to 7 percent for 5th and 7th harmonic duty | 14 percent where the 3rd harmonic is present |
| Short circuit protection | semiconductor fuse per maker table | aR class, sized on the step current |
| Accessories | BD-050 / BD-100 / BD-200 current limitation reactor, EW-22 discharge resistor | ESP-24 feed-in module for up to ten bus triggered modules |
| Capacitor condition | discharged below 50 V before reclosing | a discharge reactor shortens the wait at fast reclosing |
Included Models and Order Codes
The type code carries the family and the kvar, and the family decides the network and the way the module is triggered. TSM-LC is the three phase module for 380 to 440 V networks and takes a 12 to 24 V DC trigger from the controller. The N1, N480 and N690 versions widen the voltage window without a separate trigger supply, which is why they are picked for 480 V and 690 V panels. TSM-LC-S sits on a system bus: one patch cable feeds up to 32 modules from a BR7000 type controller, and the module reports voltage, current, reactive power and temperature back on the same cable. TSM-LC-I is the single phase module for load to neutral or phase to phase steps up to 22 kvar. Where only a withdrawn ordering code exists for a module, the row says so and the current code is quoted instead.
| Type | Capacitive load | Voltage | Control and notes |
|---|---|---|---|
| TSM-LC10 | 10 kvar | 3 x 400 V AC | 12 to 24 V DC trigger, one step per module |
| TSM-LC25 | 25 kvar | 3 x 380 to 440 V AC | 12 to 24 V DC trigger |
| TSM-LC50 | 50 kvar | 3 x 380 to 440 V AC | code B44066T0050E402 withdrawn, replaced by B44066T3050E402 |
| TSM-LC100 | 100 kvar | 3 x 380 to 440 V AC | code B44066T0100E402, largest LC frame |
| TSM-LC-N1 | up to 55 kvar | 380 to 440 V AC | integrated supply, no separate trigger module |
| TSM-LC-N480 | 25 to 50 kvar | 380 to 480 V AC | code family B44066T3850E408 |
| TSM-LC-N690 | 40 to 75 kvar | 3 x 380 to 690 V AC | code family B44066T3050E690 |
| TSM-LC-S | up to 55 kvar | 3 x 200 to 440 V AC | system bus trigger, up to 32 modules per controller |
| TSM-LC-I | 10 to 22 kvar | 1 x 230, 400, 440, 480 or 525 V AC | single phase, load to neutral or phase to phase |
Capacitor Current per Step at Three Network Voltages
The module is chosen on kvar, but the cable, the fuse and the reactor are chosen on current. The table gives the step current at the three voltages that appear in most drawings, calculated as reactive power divided by the square root of three times the line voltage. A 50 kvar step is 72 A at 400 V and 42 A at 690 V, so a module moved to a 690 V network keeps its kvar and loses more than a third of its current.
| Step size | Current at 400 V | Current at 440 V | Current at 690 V |
|---|---|---|---|
| 10 kvar | 14.4 A | 13.1 A | 8.4 A |
| 12.5 kvar | 18.0 A | 16.4 A | 10.5 A |
| 25 kvar | 36.1 A | 32.8 A | 20.9 A |
| 50 kvar | 72.2 A | 65.6 A | 41.8 A |
| 100 kvar | 144.3 A | 131.2 A | 83.7 A |
Key Features
Closing at current zero – the pair is fired where the current crosses zero, so the step charges without an inrush peak and the network sees no voltage step.
5 ms reaction – the module reacts on the trigger edge, which is what lets a bank follow a welding line or a press instead of averaging the load over a minute.
Self observing module – supply voltage, phase sequence, capacitor output and temperature are checked inside the module, and a fault is shown on the display and on a contact.
One module per step to 100 kvar – steps are built from 10, 25, 50 and 100 kvar frames, and a larger step is made from parallel modules rather than from a bigger single device.
Voltage classes to 690 V – 380 to 440 V, 380 to 480 V and 380 to 690 V families share the same control logic, so a 690 V panel is not forced onto a 400 V part.
Bus triggered variants – one patch cable carries trigger and measurement for up to 32 modules, which removes the row of control wires that a contactor bank needs.
Fuse and reactor on the drawing – semiconductor fuses and a 5.7 to 7 percent reactor are part of the step, and both are named with the module so the panel drawing closes.
Applications
Three load patterns pay for a thyristor step rather than a contactor, and each one stresses a different part of the module.
Welding lines and presses – the load swings within a cycle, so the bank switches several times a minute and a contactor reaches its cycle count in months rather than years.
Lifts, cranes and hoists – regenerative travel pushes reactive power back and forth, and a step that closes without a transient keeps the voltage steady at the far end of the riser.
Wind and solar converters – the converter output moves with the wind or the irradiance, and a dynamic step holds the power factor at the point of connection without waiting for a capacitor to discharge.
A compensation panel is often quoted as a board plus a bill of switches, so the SUPERB PCBA and the SUPERB PCB are reviewed against the same step list and the trigger wiring is checked once for both.
Sourcing and Cross-Reference
The first question on a replacement is the frame, not the kvar. A 50 kvar LC module sits on the same mounting plate as the unit it replaces, but the N480 and N690 frames are deeper and need the clearance above them. The second question is the trigger: a module fed from a controller with a 12 to 24 V DC output cannot be dropped into a bus triggered row, and the other way round.
The third question is the condition of the capacitor. A module that reports low capacitor output is usually telling the truth about a step whose capacitors have lost capacitance, and replacing the module will not fix it. Reading the reported reactive power per step before ordering is the cheapest diagnostic in the panel.
For a step held up by one frame, the options are the same kvar in another voltage class, a parallel pair of smaller modules, or the older code where a maker still ships it. See lead time and availability for a specific type, and BOM shortage recovery where a compensation panel is waiting on one module.
The SUPERB Assembly team torques the busbar joints and the fuse holders to the maker figures, because a loose joint on a 100 kvar step is a hot spot within a week.
Q: Can you confirm the module kvar at 690 V, and the fuse and reactor that go with it, before we release a replacement for our bank?
A: Yes. Send the step kvar, the network voltage, the number of steps, the controller output type and the panel ambient, and the SUPERB Tech team returns the module, the fuse and the reactor that fit.
Why Panel Builders Source Thyristor Steps Through SUPERB
- Frame and voltage class first: every row names the family and the network window, so a 690 V panel is not quoted a 400 V module with the kvar scaled in a spreadsheet.
- Trigger interface stated: 12 to 24 V DC trigger and system bus versions are kept apart, because a module that does not match the controller output will not switch at all.
- Fuse and reactor together: semiconductor fuse class and the 5.7 to 7 percent reactor are quoted with the module, which keeps the step coordination inside one document.
- Discharge path named: the 50 V reclosing condition and the discharge reactor that meets it are part of the offer, so a fast switching duty does not restart on an uncharged assumption.
Related Product Families
This page is part of the component range we supply for industrial, telecom, medical and defence builds. Continue with: Capacitor Switching Contactors for Power Factor Correction, Power Factor Correction Capacitors for Panel Compensation, Detuned Reactors and Harmonic Filters for Capacitor Banks, Reactive Power Controllers for Automatic Capacitor Banks, NH Fuse Links and DIN Rail Fuse Bases, Component Lead Time Solutions.