Voltage Transformers for Panel Metering and Protection

A voltage transformer brings 415 V down to 110 V so a meter or a relay can read the line without touching it. Three phase units run 25 to 200 VA at class 0.5 or class 1, with a 1.9 voltage factor for eight hours. Residual winding types give 110/110 V for broken delta earth fault detection on the same footprint. Single pole units go up to 36 kV system voltage where the metering point sits on a medium voltage board.
quote now

Product Specifications

Product Overview

A panel meter reads 110 V, not 415 V. Everything between the busbar and the meter terminal is the voltage transformer, and that is where accuracy is either kept or lost. The unit has to hold its ratio at the actual burden, not at the burden printed on a catalogue page, and it has to survive the voltage rise that follows a single phase earth fault on an isolated network. A transformer bought on ratio alone usually fails one of those two points.

The second decision is the winding count. A single secondary feeds a meter. A transformer with two secondary windings feeds a meter and a protection relay from one primary connection, which removes a second set of fuses and a second hole in the panel. A residual winding goes further: three phase to earth windings connected in broken delta add up to near zero in normal service and rise to the full residual voltage during an earth fault, which is how an earth fault relay sees an unearthed network.

The third decision is mechanical. A 100 VA three phase unit weighs around 25 kg and needs a base with four fixing holes plus clearance for the terminal shroud. A 25 VA unit weighs 12 kg and fits a smaller cubicle. The table below gives burden, voltage factor and weight per ordering code, so the panel depth is decided with the same document as the ratio.

Key Specifications

ParameterValueNote
Typethree phase, tape wound or cast resinindoor panel mounting, base with four fixing holes
Primary voltage415 V three phase, four wireprimary terminals marked A, B, C and N
Secondary voltage110 V, or 110/110 V with a second windingsecond winding is the metering or residual winding
Accuracy classclass 0.5 or class 1class per burden column, not a single figure per unit
Rated burden25, 50, 100 or 200 VAburden chosen per winding and per class
Voltage factor1.9 for 8 hours1.9 for 30 seconds on the residual voltage types
Secondary neutralbrought out and may be earthed in serviceone terminal per secondary winding
Frequency50 or 60 Hz, fixed at ordercore and turns set for one frequency
Terminal shroudacrylic shroud on requestadds 30 mm to the height of the unit
Weight12 to 30 kg12 kg at 25 VA, 26 to 30 kg at 100 VA with two windings
Mountingcubicle floor or panel basefootprint from 250 x 120 mm to 450 x 180 mm
Standardbuilt to BS, IEC and AS practice, type testedroutine tests with the unit on delivery
Medium voltage range7.2 kV to 36 kV system voltagesingle pole units, ILV 20 kV to 170 kV
Medium voltage burden10 to 300 VA depending on classclass 0.2, 0.5, 1 and 3P listed per unit

Included Models and Order Codes

The ordering code carries the frame and the winding set. 5320-VTP is the tape wound three phase unit and 5321-VEC is the same winding in cast resin: the electrical data is shared, the difference is the insulation system and the creepage path in a damp cubicle. The last two digits pick the burden and the winding count. Units ending 01 and 02 are single secondary 415/110 V at 25 and 50 VA. Units ending 03, 04 and 05 add a second winding or a 415 V secondary, and they are the ones used where a meter and a relay share one primary connection. 5520-VTP-255 is the residual voltage unit: 415/110/110 V with the second winding rated for the residual duty, and its voltage factor is 1.9 for 30 seconds rather than 8 hours, because it is expected to carry the rise during a fault rather than a sustained overvoltage.

Order codeRatioBurden at class 0.5Burden at class 1Weight
5320-VTP-234-01 (tape) / 5321-VEC-235-01 (resin)415/110 Vnot offered25 VA12 kg
5320-VTP-234-02 / 5321-VEC-235-02415/110 Vnot offered50 VA14 kg
5320-VTP-234-02 / 5321-VEC-235-02415/110/110 Vnot offered25 VA plus 25 VA14 kg
5320-VTP-234-03 / 5321-VEC-235-03415/415 V50 VA50 to 100 VA20 kg
5320-VTP-234-03 / 5321-VEC-235-03415/110/110 V50 VA50 to 100 VA plus 50 to 100 VA22 kg
5320-VTP-234-04 / 5321-VEC-235-04415/110 V100 VA200 VA25 kg
5320-VTP-234-05 / 5321-VEC-235-05415/110/110 V100 VA200 VA plus 100 VA26 kg

Residual and Medium Voltage Units

Two families sit beside the standard three phase unit. The residual voltage transformer 5520-VTP-255 has two 110 V windings, the second one rated for the residual duty of a broken delta connection, and it is chosen when the panel has to detect an earth fault on an unearthed or resistance grounded network. The single pole VEC-213 range covers metering points on a medium voltage board: the insulation level (ILV and BIL) and the burden per class decide the model, and the table lists the values as the maker publishes them.

Order codeRatioBurdenVoltage factorWeight
5520-VTP-255-02 / 5521-VEC-256-02415/110/110 V25 VA plus 25 VA1.9 for 30 s19 kg
5520-VTP-255-03 / 5521-VEC-256-03415/110/110 V50 VA plus 100 or 50 VA1.9 for 30 s23 kg
5520-VTP-255-04 / 5521-VEC-256-04415/110/110 V100 VA plus 200 or 100 VA1.9 for 30 s27 kg
5520-VTP-255-05 / 5521-VEC-256-05415/110/110 V100 VA plus 200 VA1.9 for 8 h30 kg
VEC-213-627.2 kV class, ILV 20 kV10 to 100 VA1.2 continuous18 kg
VEC-213-5612 kV class, ILV 28 kV25 to 200 VA1.2 continuous23 kg
VEC-213-2912 kV class, ILV 36 kV25 to 200 VA1.2 continuous23 kg
VEC-216-0136 kV class, ILV 70 kV50 to 200 VA1.2 continuous65 kg

Key Features

Ratio held at the real burden – class 0.5 and class 1 are quoted with the burden that goes with them, so a meter that draws 40 VA is not fed from a unit rated 25 VA at class 1.

One primary, two windings – a 110/110 V unit feeds a meter and a relay from a single primary connection, which removes a second fuse set and a second cable run into the cubicle.

Residual winding for earth fault – the broken delta winding reads close to zero in normal service and rises to full residual voltage during an earth fault, which is what the relay expects.

Voltage factor 1.9 – the winding carries 1.9 times rated voltage for eight hours, and the residual types carry it for 30 seconds, which covers the rise during a fault.

Secondary neutral brought out – each secondary has its own neutral terminal, so the winding can be earthed at the panel or left floating as the scheme requires.

Tape wound or cast resin – the same winding is offered in both insulation systems, and the resin version is the one for damp or dirty cubicles where creepage has to be protected.

Footprint stated per code – weight and base dimensions are listed per ordering code, so the cubicle depth is checked before the unit arrives rather than after.

Terminal shroud option – an acrylic shroud covers the primary terminals and adds 30 mm to the height, which is often the difference between fitting a cubicle and not.

Applications

Three places where the choice between a metering unit and a residual unit decides the scheme, not just the part number.

Sub metering in a low voltage panel – a three phase 415/110 V unit feeds a multifunction meter, and the class 0.5 burden is chosen so the meter still reads within its own accuracy at the low end of the load.

Earth fault detection on an unearthed network – three residual windings in broken delta give the relay a voltage to work with, and the 1.9 for 30 seconds rating covers the rise while the fault is cleared.

Metering and protection on one primary – a two winding unit feeds a meter and an overcurrent relay from one connection, which is the usual arrangement where panel space does not allow two separate transformers.

A metering panel is often quoted as a board plus a bill of instruments, so the SUPERB PCBA and the SUPERB PCB are reviewed against the same transformer list and the ratio and burden are checked once for both.

Sourcing and Cross-Reference

The first question on a replacement is the winding count, not the ratio. A 415/110 V unit cannot replace a 415/110/110 V unit, because the second winding carries the residual duty and the relay setting was made against it. The second question is the burden actually connected today, since a meter added after commissioning can push a class 0.5 unit into class 1 territory without anyone noticing.

The third question is the voltage factor. A residual unit rated 1.9 for 30 seconds and one rated 1.9 for 8 hours look the same on a drawing, but a scheme that holds the rise for minutes needs the longer rating. Reading the code before ordering avoids a unit that saturates the first time a feeder trips.

Where the original code is no longer listed, the usual route is the same ratio and burden in the other insulation system, or the next frame up with the burden unchanged. See lead time and availability for a specific code, and obsolete part cross reference where the panel is being rebuilt from an old drawing.

The SUPERB Assembly team lands the primary terminals at the maker torque and keeps the secondary neutral earthed at one point only, because a second earth on that winding turns the residual reading into noise.

Q: Can you confirm the second winding rating and the voltage factor of the unit you quote, because our earth fault relay setting was made against the original transformer?

A: Yes. Send the primary voltage, the ratio, the number of windings, the burden and class, the voltage factor and the panel depth, and the SUPERB Tech team returns the code that fits.

Why Panel Builders Source Voltage Transformers Through SUPERB

  1. Winding count stated per code: every row names the ratio and the number of windings, so a residual duty unit is not quoted where a plain metering unit was asked for.
  2. Burden and class kept together: the burden is always quoted with its class, which is how the meter accuracy is protected at low load instead of only at full load.
  3. Voltage factor on the row: 1.9 for eight hours and 1.9 for thirty seconds are kept apart, because the scheme timing decides which one is safe.
  4. Mechanical data with the electrical data: weight, base size and shroud clearance sit in the same document as the ratio, so the cubicle is checked once.

Related Product Families

This page is part of the component range we supply for industrial, telecom, medical and defence builds. Continue with: Metering Current Transformers for Panel and Switchgear, Protection Current Transformers for Overcurrent Relays, Earth Fault Relays for Resistance Grounded Systems, Multifunction Power Meters and Power Quality Analyzers, CT Test Terminal Blocks and Shorting Links, Component Lead Time Solutions.