The LTC3226EUD#TRPBF from Analog Devices is a high-performance analog / mixed-signal IC providing precision signal acquisition, conversion, and conditioning. Analog Devices (ADI) is a world leader in high-performance analog, mixed-signal, and DSP ICs for instrumentation, healthcare, automotive, and communications.
Superb Automation partners with leading brands including Qorvo, TI, ADI, XILINX, NVIDIA, Intel, ST, MACOM, Renesas, and Coilcraft to provide complete BOM and supply-chain solutions.
Key Features
- High-resolution data conversion with excellent SNR and THD
- Wide dynamic range and high linearity across operating conditions
- Integrated voltage reference with low temperature drift
- Flexible digital interface — SPI, I2C, or parallel options
- Industrial/automotive temperature range with guaranteed specs
- Low power consumption with power-down modes
Key Specifications
| Resolution | bits |
| Channels | — |
| Sample Rate | kSPS |
| Interface | — |
| Supply Voltage | V |
| Operating Temp | °C |
| Package | — |
| INL | LSB |
| SNR | dB |
| THD | dB |
Applications
LTC3226EUD supercapacitor hold up for a 3.3 V rail
The LTC3226EUD is a two cell series supercapacitor charger with a backup PowerPath controller in a 16-lead 3 mm by 3 mm QFN. It combines three things that are normally three separate circuits: a charge pump that charges the supercapacitor stack from a 2.5 V to 5.5 V input at a programmable current, an ideal diode path from the input to the output, and an internal low dropout regulator that carries the output from the supercapacitors when the input fails. The E letter is the temperature grade of this order code.
Three states, one part
In normal operation the input feeds the output through the ideal diode and the charge pump tops up the stack. When the input falls below the power fail threshold set by an external divider, the part switches to backup and the low dropout regulator carries the output from the stack. When the input returns, the ideal diode takes over again and the charge pump resumes. The threshold is a resistor divider, so the trip point is a decision on the board rather than a fixed number, and it should be set below the lowest legal input so a brownout does not trigger a backup that the system does not need.
The hold up arithmetic
Two 1 F cells in series are 0.5 F, and the energy stored at 5 V is 6.25 J. The useful part is what can be delivered before the stack falls to the low dropout regulator's minimum, which is 2.5 V in this example, leaving 4.69 J. At a constant current load the voltage falls linearly, so the average is 3.75 V:
| Backup load | Current from the stack | Useful energy | Hold up time |
|---|---|---|---|
| 0.5 A at 3.3 V | 0.5 A | 4.69 J | 2.50 s |
| 1.0 A at 3.3 V | 1.0 A | 4.69 J | 1.25 s |
| 2.0 A at 3.3 V | 2.0 A | 4.69 J | 0.62 s |
The time is short compared with a battery, and that is the point: a supercapacitor is for riding through a power cut long enough to finish a write, park a head or send a last message, not for continuing the job. Doubling the capacitance doubles the time, and going to a higher stack voltage quadruples the energy for the same capacitance, which is why the stack voltage matters more than the farad rating on the label.
The charge side is the slow side
The input current limit is programmable up to 315 mA. Charging 0.5 F to 5 V at 315 mA takes 7.94 s, so the charge path is 6.3 times slower than a 2 A backup discharge. A product that is power cycled faster than that arrives at the next power cut with a partly charged stack, and the hold up time is then shorter than the calculation above. The input limit is also a courtesy to the upstream supply: a 315 mA cap on the charge current keeps a weak adapter from collapsing when the stack is empty.
Where this part is not the right answer
It is a two cell charger, so a four cell stack needs the larger controller. It has no telemetry, so a system that needs to know the stack capacitance or its ESR has to measure it externally. The backup regulator is a linear regulator, so the loss across it is the stack voltage minus the output voltage times the current, which becomes the thermal limit long before the 2 A figure does.
The linear backup regulator is the thermal limit
The internal low dropout regulator carries the output from the supercapacitor stack during backup, and a linear regulator dissipates the difference between its input and its output times the current. With the stack at 5 V and the output at 3.3 V the drop is 1.7 V, so 0.5 A is 0.85 W, 1 A is 1.7 W and the 2 A peak is 3.4 W inside a 3 mm by 3 mm body. The 2 A figure is therefore a peak for the first fraction of a second, not a number to hold for the whole backup window.
The same arithmetic shows why the backup time depends on when the load is applied. Early in the discharge the stack is at 5 V and the regulator is dissipating its maximum; as the stack falls toward 4 V the drop is 0.7 V and the loss at 2 A is 1.4 W. A backup load that is only applied when the stack has already fallen is much easier on the part than one that is applied at the instant of the power fail, and that is a firmware decision as much as a hardware one.
Questions that come up on this part
How many cells does it charge? Two in series, with automatic cell balancing. A four cell stack needs the larger controller with per cell shunt protection.
Can it charge from 3.3 V? Yes. The input range is 2.5 V to 5.5 V, but the programmable stack voltage has to stay below the input, so a 3.3 V input cannot charge a 5 V stack.
What happens if the output is shorted? The part has internal current limit and thermal shutdown, and the vendor states it survives a continuous short from the PROG or CPO pins to ground. Surviving is not the same as continuing to operate, and a short still ends the backup.
Does it tell the system that backup started? The power fail comparator is the signal, and it is set by an external divider, so the system can be told before the rail has actually moved. That early warning is what lets the processor start its shutdown sequence instead of being surprised.
Sourcing notes and next step
Confirm the stack cell count and the power fail divider before ordering, because both are board decisions that the part cannot correct. Our power management cross reference page lists what we can quote against a code, the BOM shortage page covers the backup rail route, and the analog and mixed signal category holds the rest of the backup family.
Request Quote — In Stock, 100% New & Original, Full Warranty