TPS65265RHBR
Product Specifications
TPS65265RHBR
Texas Instruments — Power Management & Signal Chain
Product Overview
The TPS65265RHBR from Texas Instruments is a power management / signal chain IC delivering high efficiency, precision regulation, and robust protection. Texas Instruments (TI) is a global leader in analog ICs, power management solutions, and embedded processors.
Superb Automation partners with leading brands including Qorvo, TI, ADI, XILINX, NVIDIA, Intel, ST, MACOM, Renesas, and Coilcraft to provide complete BOM and supply-chain solutions.
Key Features
- High-efficiency power conversion with low quiescent current
- Wide input voltage range with precision output regulation
- Integrated over-current, over-temperature, and short-circuit protection
- Small footprint packaging for space-constrained designs
- AEC-Q100 qualified options available for automotive applications
- Flexible sequencing and soft-start control
Key Specifications
| Input Voltage | V |
| Output Voltage | V |
| Output Current | A |
| Switching Frequency | kHz |
| Efficiency | % |
| Quiescent Current | µA |
| Topology | — |
| Package | — |
| Operating Temp | °C |
| Protection | — |
Applications
Request Quote — In Stock, 100% New & Original, Full Warranty
TPS65265RHBR: Three synchronous bucks at 5 A, 3 A and 2 A from a 4.5 V to 17 V input in a 32 pin QFN
TPS65265RHBR is a triple step down converter in the 32 pin RHB body with a 0.6 V reference, an adjustable clock from 250 kHz to 2.3 MHz, 120 degree phase spacing between the three rails and a fixed 2.4 ms soft start on each in a VQFN-32 body of 32 pins. The TPS65265 is one package that replaces three buck converters in a system with a 12 V or a 5 V intermediate rail. Buck 1 delivers 5 A, buck 2 delivers 3 A and buck 3 delivers 2 A, each with its own enable pin, its own compensation pin and its own power good. The reference is 0.6 V with 1.33 percent accuracy, the switching frequency is set by a resistor or by an external clock, and the three phases are spaced 120 degrees apart to spread the input current ripple. Six power up and power down sequences are available, with an adjustable interval between rails.
Order code and package
| Order code | TPS65265RHBR |
| Input voltage | 4.5 V to 17 V |
| Output 1 | 5 A continuous |
| Output 2 | 3 A continuous |
| Output 3 | 2 A continuous |
| Reference voltage | 0.6 V, plus or minus 1.33 percent |
| Switching frequency | 250 kHz to 2.3 MHz, adjustable |
| Phase spacing | 120 degrees between buck 1, buck 2 and buck 3 |
| Soft start | 2.4 ms fixed on each rail |
| Package | 32 pin VQFN, RHB body |
Electrical parameters that decide the application
| Internal regulator, V7V | 5.9 V minimum, 6.1 V typical, 6.3 V maximum |
| V7V current limit | 110 mA minimum, 177 mA typical, 235 mA maximum |
| Enable pin pull up current | 2.9 uA internal source |
| Overvoltage trip | 107.5 percent of the internal reference, rising |
| Mode selection | pulse skipping or forced continuous conduction |
| Power good | per rail, with an adjustable delay |
| Power up and down sequences | 6 combinations, adjustable interval |
| V7V capacitor | 10 uF to power ground |
| Bootstrap capacitor, buck 2 | 47 nF recommended |
| Enable and mode pin absolute maximum | 7 V, 6.3 V recommended |
Points to check before this part goes on a BOM
A 0.6 V reference with 1.33 percent accuracy sets the floor on every rail in the system. At a 1.2 V output the tolerance is 16 mV, at 0.9 V it is 12 mV, and at 3.3 V it is 44 mV, before the divider tolerance and the load regulation are added. A core rail specified at plus or minus 3 percent therefore has about half its budget left for everything else, and a rail specified at 1 percent cannot be met by this reference at all. The number to compare is not the reference accuracy but the reference accuracy plus the divider and the amplifier offset, which is why the board tables in the document pair the reference with 1 percent dividers.
The 2.4 ms fixed soft start looks slow until the numbers are put on it. Charging a 100 uF output to 1.2 V in 2.4 ms draws 50 mA above the load, which is nothing against a 5 A rail. What the fixed time really provides is a known ramp for sequencing: three rails that all start at the same instant and all finish in 2.4 ms reach their final values together, which is the right answer for a system where no rail has a dependency, and the wrong answer for one where the 1.8 V rail must not appear before the 3.3 V rail. In that case the interval between rails, not the ramp itself, is the parameter that matters.
The 120 degree phase spacing between the three rails is an input ripple argument. Three converters running at the same frequency and the same phase add their input current pulses, and the capacitor at the input sees the sum. With 120 degrees between them the pulses interleave and the root mean square current in the input capacitor falls, which is why one 10 uF ceramic can serve three rails that would each need their own if they ran in phase. The benefit disappears if the clock is synchronised to an external source without keeping the spacing, so the external clock should be at three times the per rail frequency.
The V7V regulator inside the part feeds the gate drivers and has a current limit of 177 mA typical, 110 mA minimum. Each high side gate consumes the gate charge of the external MOSFET every cycle, so at 1 MHz with a 30 nC gate the current per phase is 30 mA, and three phases are 90 mA. That leaves about 20 mA of the minimum limit for margin, and it means a board that raises the frequency to shrink the inductor is also raising the internal supply current. At 2.3 MHz the same three gates draw 207 mA, above the typical limit, so the frequency and the gate charge have to be chosen together.
The enable pins have an internal 2.9 uA pull up, so a rail that has no external drive comes up on its own. That behaviour is convenient on a board where the sequence does not matter and dangerous on one where it does, because an unconnected enable is read as a command to start. The six sequencing combinations are selected by pin strapping, and the interval between rails is set by a capacitor, so both are board level decisions. A change from one sequence to another after the board is built is a component change, not a register write.
The overvoltage trip is at 107.5 percent of the reference, rising, which on a 1.2 V rail is 1.29 V. Most loads tolerate 5 percent and some tolerate 10, so the trip sits between the two and is a protection rather than a regulation limit. What it protects is the load, not the converter: the high side switch turns off when the feedback exceeds the threshold and stays off until the feedback falls below 105 percent, so the rail folds rather than latches, and a load that keeps the rail high sees a series of hiccups rather than a shutdown.
Three switching loops in a 32 pin body means the input capacitors are the routing constraint. Each rail needs its own ceramic within a few millimetres of its own pair of pins, and the ground return of each loop has to reach the pad without sharing a path with the others. The single bulk capacitor on the input bus does not substitute for those three, because the loop area that matters is the one between each high side switch and its own ground pin. A board that shares one ceramic among three phases shows the switching noise of one rail on the feedback of another.
Where this order code fits
This order code belongs in industrial controllers, gateways, set top boxes, panel computers and instrumentation that need a 5 V, a 3.3 V and a 1.8 V rail from a 12 V bus in one place on the board. It is also the part chosen when the three rails have to come up in a defined order, because the sequence and the interval are set by the device rather than by three separate enable signals from a supervisor. Teams comparing it with a neighbouring part start from our Power Management Cross Reference page, and teams replacing a part that has gone end of life start from the BOM Shortage Recovery page.
Questions buyers ask
Can the three rails be sequenced in any order? The device supports six power up and power down combinations with an adjustable interval between rails, and the combination is chosen by pin strapping. Any order that the six cover can be built, and an order outside them needs an external supervisor driving the enable pins. The interval is set by a capacitor, so the timing is fixed at build rather than at run time.
What happens at 2.3 MHz with large external MOSFETs? The internal V7V regulator has to supply the gate charge of all three high side devices every cycle, and its typical limit is 177 mA. Three 30 nC gates at 2.3 MHz draw 207 mA, above that limit. The regulator current limits and the gate drive collapses, which shows up as overheating external devices rather than as a clean shutdown, so the high frequency end of the range belongs with small gate charge parts.
Is the 0.6 V reference accurate enough for a core rail? It is 1.33 percent on the reference alone, before the divider and the amplifier offset. A rail that needs 1 percent total cannot be built from this device without trimming, and a rail that needs 3 percent has room. The figure that decides is the total budget including load regulation over the full current range, not the reference accuracy by itself.
Why does an unconnected enable pin start the rail? Because the pin has a 2.9 uA internal pull up, so an open pin reads as a logic high. Any rail that must stay off until a controller allows it needs the enable driven or pulled down, and a board with a connector that can be unplugged has to treat the enable as a signal that can float.
SUPERB holds and sources this converter line against the exact order code, with the reel, date code and country of origin stated on the offer. When a rail has to move to a second part, the Component Lead Time Solutions page sets out the checks that separate a working substitute from one that fails on the bench.