A bare board is either right or it is scrap, and the difference is usually decided before it ever reaches assembly. Every PCB we ship is inspected against IPC-6012 and IPC-A-600 before it is packed, and the inspection is not a visual pass at the end of the line: it is a set of measurements taken at the points where the process can still go wrong.

This page lists the eleven checks we run, what each one proves, and what record comes back with the panel. Each check links to the full method, equipment and acceptance criteria.

Supplier self-check is not a shipment inspection

Fabricators inspect their own work; that is normal and necessary. It is also the inspection least likely to catch a systematic problem, because the same specification, the same operator and the same assumptions produce both the board and the report. Our pre-shipment inspection exists to answer a different question: not "did the line do what it intended" but "does this panel meet the specification we sold, measured independently, before it leaves".

In practice the failures that reach a customer are rarely exotic. They are a plating thickness at the low end of the tolerance, an annular ring that closed on one corner of the panel, a solder mask skive over a fine-pitch pad, a controlled-impedance trace that drifted two ohms outside the coupon window, or a hole wall with a void that only shows in section.

The eleven checks

CheckWhat it provesMethod
Open and short testEvery net is continuous and no two nets are bridgedFlying probe or bed-of-nails, 100 percent net coverage
Hole inspectionDrill position, diameter and registration against the artworkX-ray drill targeting and optical measurement
Artwork and film inspectionInner-layer pattern integrity before laminationAOI on inner layers
Final visual inspectionMask, legend, edge quality, scratches, contaminationIPC-A-600 criteria at dedicated inspection stations
Impedance TDR testControlled-impedance traces sit inside the specified windowTime-domain reflectometry on the impedance coupon
Microsection analysisPlating thickness, annular ring, etchback, hole-wall voidsCross-section, measured at the knee of the hole
Thermal stress testPlating survives soldering without barrel cracks or delaminationConditioned sample through a solder float or reflow cycle, then section
X-ray inspectionRegistration between layers, drill breakout, internal featuresX-ray on registration coupons and suspect areas
Solderability testThe finish wets within the specified time after storageWetting balance or dip-and-look on production samples
Ionic contaminationResidual ionic species are below the limit that causes corrosion and leakageROSE extraction, expressed in micrograms of sodium chloride equivalent per square centimetre
Bed-of-nails ICTBare-board electrical behaviour beyond continuity: resistance and isolation at test voltageFixture-based test where volume justifies it

What the specification actually requires

The acceptance criteria are not ours to invent. They come from the standards the order was placed against, and each one answers a different question:

  • IPC-6012 sets the qualification and performance requirements for rigid boards: plating thickness, annular ring, hole wall quality, mask and finish.
  • IPC-4101 defines the laminate specification, which is what makes a TG150 board a TG150 board rather than a claim.
  • IPC-TM-650 holds the test methods: how the measurement is made, at what temperature, on how many samples.
  • ANSI/ESD S20.20 covers the handling environment, which matters because a board that passes inspection can still be damaged on the way to the bag.
  • Surface finish specification defines what ENIG, lead-free HASL, OSP and immersion silver are expected to deliver, including thickness and shelf life.

Sampling, and when we test everything

Not every check is worth running on every panel, and pretending otherwise inflates the price without improving the outcome. The split we use:

  • 100 percent: open and short test, final visual inspection, and the finish thickness measurement on ENIG panels.
  • Per lot, on coupons: impedance, microsection, thermal stress, solderability. These are destructive or coupon-based and their value comes from being representative of the lot rather than of one panel.
  • Per lot, on production samples: ionic contamination, X-ray registration checks.

Where a customer's end use justifies tighter control — a Class 3 build, an RF board where a two-ohm impedance drift is a functional failure, a medical product — the sampling plan moves to 100 percent on the affected characteristic, and the price reflects the test time rather than a vague surcharge.

The release record

Every shipment leaves with a release pack: the electrical test report, the impedance report with the measured values against the specified window, the microsection photographs with measured plating and ring dimensions, the finish thickness readings, and the final inspection result with the inspector and date. Where a check was sampled, the pack states the sample size and the lot it represents.

If a customer's incoming inspection later finds something, the pack is what makes the conversation short: either the record shows the characteristic was in specification at shipment, or it does not, and then it is our problem.

Before you release a PCB order

Send the Gerber set and the specification you want the boards held to. We will confirm the stackup, the finish, the impedance targets and the inspection plan before the panel is released to fabrication, so the test coupons match the design rather than a default.

Email pcba@superb-tech.com or WhatsApp +86 133 9608 1443 with your files and target quantity.

Before and after this stage

This is the second gate. It follows pre-shipment component inspection, which decides whether the parts are fit to build with, and it precedes PCBA inspection before shipment, where the assembled board is tested under power.