TPS628301ADRLR
Product Specifications
TPS628301ADRLR
Texas Instruments — Power Management & Signal Chain
Product Overview
The TPS628301ADRLR from Texas Instruments is a power management / signal chain IC delivering high efficiency, precision regulation, and robust protection. Texas Instruments (TI) is a global leader in analog ICs, power management solutions, and embedded processors.
Superb Automation partners with leading brands including Qorvo, TI, ADI, XILINX, NVIDIA, Intel, ST, MACOM, Renesas, and Coilcraft to provide complete BOM and supply-chain solutions.
Key Features
- High-efficiency power conversion with low quiescent current
- Wide input voltage range with precision output regulation
- Integrated over-current, over-temperature, and short-circuit protection
- Small footprint packaging for space-constrained designs
- AEC-Q100 qualified options available for automotive applications
- Flexible sequencing and soft-start control
Key Specifications
| Input Voltage | V |
| Output Voltage | V |
| Output Current | A |
| Switching Frequency | kHz |
| Efficiency | % |
| Quiescent Current | µA |
| Topology | — |
| Package | — |
| Operating Temp | °C |
| Protection | — |
Applications
Request Quote — In Stock, 100% New & Original, Full Warranty
TPS628301ADRLR: 1 A Step-Down Converter With 1 Percent Output Accuracy
TPS628301ADRLR is a one amp synchronous step-down converter with a 1 percent reference in a 8-pin WQFN body of 8 pins. It takes 2.25 V to 5.5 V in, delivers 1 A, and holds the output within 1 percent in PWM mode, in a package 1 mm by 2 mm with the inductor left outside.
Order code and package
| Ordering string | TPS628301ADRLR, WQFN-HR (RZE), 1.0 mm by 2.0 mm |
| Family | TPS628301 at 1 A, TPS628302 at 2 A, TPS628303 at 3 A, TPS628304 at 4 A |
| Input | 2.25 V to 5.5 V |
| Output | 0.5 V to 4.5 V, 1 A |
| Inductor | 0.47 uH nominal, 1.0 uH upper value in the recommended range |
| Logic | 1.2 V GPIO compatible enable and mode pins |
Electrical parameters that decide the application
| Reference | 500 mV, plus or minus 1 percent in PWM mode |
| Quiescent current | 7 uA typ, 17 uA max, not switching |
| Shutdown current | 100 nA typ, 700 nA max |
| UVLO rising | 2.05 V to 2.25 V |
| UVLO hysteresis | 90 mV to 120 mV |
| Soft start | 180 us to 440 us to 95 percent |
| Enable delay | 120 us to 220 us |
| Thermal shutdown | 150 C, 20 C of hysteresis |
| Input capacitor | 3 uF effective minimum |
| Output capacitor | 12 uF effective for the 1 A member |
Points to check before this part goes on a BOM
The reference is 500 mV at 1 percent, which is 5 mV, and that is the whole output tolerance: a 1.8 V rail is set by a divider from 500 mV, so the divider ratio multiplies the 5 mV by 3.6 and the resistor tolerance adds to it. A 1 percent part with 1 percent resistors is a 2 percent rail.
One amp at 1.8 V is 1.8 W, and at 90 percent efficiency the input draws 2 W, which is 400 mA from a 5 V rail. The 3 uF of effective input capacitance has to carry the difference between that 400 mA average and the pulsed current the high side FET draws, which is why the effective value and not the marked value is specified.
The lockout releases between 2.05 V and 2.25 V, so a 2.5 V rail has 250 mV of margin at worst and a 2.5 V rail at minus 5 percent has 125 mV. Below that the converter does not start, even though its output setting may be well under the input.
Quiescent current of 17 uA maximum is 149 mAh over a year, and shutdown at 700 nA is 6 mAh, so the enable pin and not the mode pin is what decides a standby budget. The 120 us to 220 us enable delay is on top of the soft start, so a rail that has to be up in 500 us uses most of its budget here.
The 1 mm by 2 mm body has no room for a thermal pad worth the name, so the 1 A rating is a current that the board copper has to support: at 1.8 V out the loss is around 200 mW, which is a 16 C rise at 77.6 C/W and 21 C at 105.7 C/W, the two figures the table gives for the two board sizes.
The 3 uF on the input is an effective value, and a 4.7 uF ceramic in an 0603 at 5 V loses close to half its capacitance to DC bias, so the marked part measures about 2.5 uF and misses the specification. The converter still runs, but the input ripple the 3 uF was chosen for rises, and that ripple lands on the rail feeding the converter rather than on its output.
The enable delay of 120 us to 220 us and the soft start of 180 us to 440 us add up, so the rail is only settled between 300 us and 660 us after the enable rises. A supervisor with a 500 us power good delay can release the processor before the slow end of that window, which is a race that appears on a cold start and never on a warm one.
Where this order code fits
Camera modules, SSD rails, point of load supplies and battery powered instruments use this part where a 1 A rail has to sit next to the load and the input is a single cell or a 3.3 V bus. An SSD rail that has to hold 1 percent across a 2.5 V to 5.5 V input range on one board revision is the other common case, and the 1.2 V compatible enable lets the converter be gated directly from the controller without a shifter. Teams comparing it with a neighbouring part start from our Power Management Cross Reference page, and teams replacing a part that has gone end of life start from the One Stop BOM Sourcing page.
Questions buyers ask
Is the output fixed or adjustable? Adjustable through a divider against a 500 mV reference, so the setting is a resistor choice and the accuracy is the reference plus the divider.
What inductor does it need? 0.47 uH is the nominal value in the recommended table and 1.0 uH is the upper value, so a 1 uH part is inside the range but changes the ripple and the transient.
Can it run from a 2.5 V rail? Yes, with 125 mV of margin at the worst case lockout. A 2.3 V rail is below the 2.25 V maximum rising threshold and may not start.
How is the mode pin used? It selects forced PWM or power save. Forced PWM gives the 1 percent accuracy figure, so a rail that needs that number has to keep the pin high and accept the quiescent current.
SUPERB holds and sources this line for production and repair demand, quoted against the exact ordering string with date codes, packing and country of origin stated on the offer. When a part is moving, the BOM Shortage Recovery page sets out the checks that keep a substitute from failing on the bench.