BQ24640RVAR
Product Specifications
BQ24640RVAR
Texas Instruments — Power Management & Signal Chain
Product Overview
The BQ24640RVAR from Texas Instruments is a power management / signal chain IC delivering high efficiency, precision regulation, and robust protection. Texas Instruments (TI) is a global leader in analog ICs, power management solutions, and embedded processors.
Superb Automation partners with leading brands including Qorvo, TI, ADI, XILINX, NVIDIA, Intel, ST, MACOM, Renesas, and Coilcraft to provide complete BOM and supply-chain solutions.
Key Features
- High-efficiency power conversion with low quiescent current
- Wide input voltage range with precision output regulation
- Integrated over-current, over-temperature, and short-circuit protection
- Small footprint packaging for space-constrained designs
- AEC-Q100 qualified options available for automotive applications
- Flexible sequencing and soft-start control
Key Specifications
| Input Voltage | V |
| Output Voltage | V |
| Output Current | A |
| Switching Frequency | kHz |
| Efficiency | % |
| Quiescent Current | µA |
| Topology | — |
| Package | — |
| Operating Temp | °C |
| Protection | — |
Applications
Request Quote — In Stock, 100% New & Original, Full Warranty
BQ24640RVAR: super capacitor charger that starts from 0 V on the pack
BQ24640RVAR is a synchronous switched-mode super capacitor charge controller in a VQFN body of 16 pins. It charges a super capacitor bank from a 5 V to 28 V input with a constant current phase followed by a constant voltage phase, and unlike a battery charger it starts from 0 V with no precharge step. The RVA order code is the 16-pin VQFN measuring 3.5 mm by 3.5 mm.
Order code and package
| Order code | bq24640RVAR |
| Package | 16-pin VQFN, 3.5 mm by 3.5 mm body |
| Packing | tape and reel |
| Input range | 5 V to 28 V on VCC |
| Charge profile | constant current then constant voltage, from 0 V |
| Power stage | external NMOS pair, 600 kHz, 30 ns driver dead time |
| Maximum duty cycle | 99.5 percent effective |
| Status pins | PG for adapter present, STAT for charge state, CE for enable |
Electrical parameters that decide the application
| Feedback regulation | VFB 2.1 V, plus or minus 0.5 percent |
| PWM frequency | 600 kHz nominal, 510 kHz to 690 kHz over temperature |
| Charge current set | 5 A per volt on ISET with a 10 milliohm shunt |
| Charge current accuracy | 3 percent |
| Off state input current | below 1.5 mA |
| Sleep drain | below 15 microampere when VCC falls under SRN |
| Under voltage lockout | 3.65 V to 4.0 V rising on VCC |
| Compensation | internal, no external compensation network |
Family variants and how they differ
| bq24640 | super capacitor charger from 0 V, this order code |
| bq24610 | battery charger with precharge, termination and a safety timer |
| bq24650 | solar input charger with input voltage regulation |
| bq24640RVAT | same part in a tube instead of a reel |
Points to check before this part goes on a BOM
A super capacitor behaves like a very large cell with a very small voltage window, so the charge current is set by ISET and held constant from 0 V, and the part spends most of a charge cycle in that phase. With a 10 milliohm shunt, 1 V on ISET is 5 A, and a 100 F bank at 16 V needs 1600 C, which is 320 seconds at 5 A before the voltage loop starts to taper.
The voltage loop regulates VFB to 2.1 V, so the bank voltage comes from the divider ratio and not from a fixed internal setting. A 0.5 percent error is 27.5 mV on a 5.5 V bank, and because stored energy rises with the square of voltage, that same 0.5 percent is about 1 percent of the energy available in the bank, which is the number that matters for a backup hold up time.
Current accuracy of 3 percent is deliberately looser than voltage accuracy, because the charge time on a capacitor bank scales with current while the final voltage sets the stored energy. A 3 percent low current adds 3 percent to the charge time, but a 3 percent high voltage would put the bank over its rating, which is why the voltage loop owns the tight tolerance.
The 99.5 percent maximum duty cycle is what lets the converter keep charging when the input is only slightly above the bank voltage, a state a battery charger never sees. Close to that point the low-side FET is on for 0.5 percent of the period, so the current sense signal is short and the 30 ns dead time starts to matter for efficiency rather than for accuracy.
Off state behaviour is the specification that protects a charged bank. With VCC below SRN the part draws under 15 microampere from the bank, so a 100 F bank at 5 V loses about 0.15 mV per second in that state, which is what keeps a memory backup alive through a long adapter outage rather than through a short one.
The TS pin monitors the capacitor temperature and suspends charge outside the window set by the divider, which matters because super capacitors age faster at elevated temperature and their ESR rises as they do. A bank that heats during a fast charge is the case the pin is there for, and the divider has to be set for the capacitor family rather than copied from a battery pack.
There is no reverse blocking switch inside the part. A bank that must not discharge back into the adapter needs an external blocking device or a diode, and the sleep comparator only stops the converter, it does not isolate the input from the output.
A capacitor bank presents the charger with a load whose voltage starts at zero, so the first instant of charge is a short circuit through the inductor and the high side FET. The current loop takes a few switching cycles to establish control, and the inductor saturation current has to cover that interval rather than only the steady 10 A.
Efficiency above 90 percent is quoted at 10 A and depends on the bank voltage relative to the input. Charging a 5 V bank from a 24 V adapter runs at a low duty cycle where switching loss dominates, and the same converter charging a 24 V bank from a 28 V input runs near full duty where conduction loss dominates. The two cases do not share a thermal answer.
Where this order code fits
It is used for memory backup, industrial uninterruptible supplies, transient buffering and bridge power for a battery, all cases where a capacitor bank replaces or assists a cell. Teams comparing it with a neighbouring part start from our Power Management Cross Reference page, and teams replacing a part that has gone end of life start from the Component Lead Time Solutions page.
Questions buyers ask
Why is there no precharge phase? Because a super capacitor has no minimum cell voltage. The part starts in constant current from 0 V, and the ISET value alone sets the current, so there is no separate trickle level to program.
Can the same board charge a battery instead? Not by changing the divider. A battery charger needs precharge, termination and a safety timer, and the bq24640 has none of those, so the two functions are separate parts even though the power stage looks the same.
SUPERB holds and sources this line for production and repair demand, quoted against the exact ordering string with date codes, packing and country of origin stated on the offer. When a part is moving, the How to Verify a Drop in Replacement page sets out the checks that keep a substitute from failing on the bench.