Contact Us
  • Home
  • BLOG
  • What Does ISO 13485 Require From a PCBA Supplier?

What Does ISO 13485 Require From a PCBA Supplier?

The certificate is the entry ticket. The clause that decides whether a supplier can build your board is 7.5.6, validation of processes, because a solder joint under a BGA and the cure of a conformal coating cannot be verified by looking at the finished unit. Where the output cannot be verified afterwards, the process itself has to be validated, and the evidence is IQ, OQ and PQ records for the specific processes your product runs through.

So the audit question is not whether the supplier holds a certificate. It is whether the supplier holds qualification records for the reflow oven, the selective soldering machine, the cleaning line, the coating line and the test fixture that will handle your board. A supplier certified for years with no protocol for the oven that will run your build is certified and not ready.

The clauses an auditor will actually open

Clause 7.5.6 covers process validation. Clause 7.5.9 sets traceability and requires the extent to be defined in the device record. Clause 7.5.2 covers cleanliness of product, which on a PCBA means ionic residue and handling. Clause 7.5.11 covers preservation, which is the bake, the dry pack and the shelf life question. Clause 4.1.5 keeps outsourced processes inside your supplier's quality system, so bare board fabrication, plating and sterilization are still their responsibility. Clause 7.4 covers purchasing and supplier control, and 8.3 and 8.5.2 cover nonconforming product and corrective action.

Read together, they ask for four things from a PCBA supplier: validated processes, defined traceability, controlled outside processes, and a corrective action system with records that close. A certificate says the system exists. The records are what show it runs.

What IQ, OQ and PQ look like on a reflow oven

Installation qualification confirms the oven is the right machine, installed to specification, with calibrated thermocouples, correct exhaust and nitrogen supply, and the facility conditions recorded: ISO 8 in the SMT area, 22 ± 3 °C and 45 to 65 percent relative humidity. Operational qualification proves the process across its full range, including the worst case: the heaviest thermal mass on the conveyor, the coldest corner of the chamber, minimum and maximum belt speed. Performance qualification runs real boards, on the real line, with trained operators, three consecutive runs, a sample size with a written statistical rationale and acceptance criteria fixed before the runs start.

A validation report that can only be read by the person who ran it is not evidence. What we hand over names the assembly revision, the paste lot, the oven recipe, the fixture serial, the acceptance criteria and the result against each one, with the profiles from the thermocouples on the heaviest and the lightest joint. If a report says only that the run passed, ask for the data behind it. Ionic cleanliness is measured on a coupon rather than judged by eye, and incoming parts are counted and inspected on arrival.

The detail buyers forget is the revalidation trigger. A paste change, an oven change, a board thickness change, a new coating material or a new fixture all invalidate the qualified state. A procedure that says "revalidate annually" has missed the point of 7.5.6, which asks for criteria for revalidation, not a calendar entry.

Three things buyers accept that they should not

The first is a certificate without reading the scope. A scope covering distribution of electronic components does not cover assembly, and a scope covering assembly may not cover coating or potting. Ask for the scope statement and match it to the processes you are buying.

The second is lot traceability when the device record needs serial traceability. Clause 7.5.9 does not prescribe serial numbers, it requires the extent to be defined, and your procedure defines it. If your file needs component lot, date code, line, operator and test result per serial, ask for one sample record before the first build. Finding out at the audit is expensive; the sterilization and device history side of the same record is no easier to reconstruct later.

The third is the missing change notification clause. Without a written commitment, a solder mask or laminate change arrives with the shipment. For a validated process that is not a paperwork problem, it is a revalidation you did not plan and a device record that no longer matches what was built.

What we hold

ISO 9001, and ISO 13485 for medical work. IPC-A-610 Class 2 and 3, IPC-6012, IPC-6018, IPC-7095, J-STD-020 and J-STD-033, ANSI/ESD S20.20. Seven SMT lines, 3D SPI, 3D AOI with DIP AOI, X-ray in 2D and CT, ICT and functional test with fixtures built for the product, selective coating, twelve zone reflow, and a bake at 125 °C to J-STD-033 before any moisture sensitive part sees the oven. Component warranty runs 730 days, with last-time buy on parts going end of life. The line detail is on turnkey PCBA assembly and medical PCBA.

SUPERB Assembly builds to print, and we say so plainly. We do not hold your 510(k) and we do not write your device master record. Validation is executed on the process we run for you, and the records go into your file. Where your procedure asks for a specific sample size, a specific acceptance number or a specific report format, we run your procedure rather than ours, and if a process on your list is outside what we hold validated, we say that at quotation.

Next step

Send the device class, the process list you need covered, the traceability extent your procedure requires and any validation protocol you want followed. We will come back with the records we can show today and the gaps we would have to close before the first build.

Need a quote or a materials review against these limits? pcba@superb-tech.com · WhatsApp +86 133 9608 1443