The screening limit is 1.00 percent total mass loss and 0.10 percent collected volatile condensable material, measured to ASTM E595 at 125 °C for 24 hours in vacuum below 5 x 10⁻⁵ torr. NASA SP-R-0022A and ECSS-Q-ST-70-02C use the same two figures. Both of them apply to each material in the build, not to the board as one item.
That last point is where most defense builds get caught. A laminate passes on its own certificate while the solder mask, the legend ink, the conformal coating and the adhesive under a shield can all sit above the limit. The condensable fraction is the part that deposits on a cold surface, and inside a sealed unit the cold surface is usually a sensor window, a relay contact or an optical detector.
What the test actually measures
A sample is held at 125 °C for 24 hours at less than 5 x 10⁻⁵ torr. Total mass loss is the percentage of mass that leaves the sample. Collected volatile condensable material is the share of that loss which condenses on a collector plate held at 25 °C, and it is the number that describes where the volatiles will land. Water vapor regained is reported separately and is not a pass or fail criterion in most specifications.
On a 5 g bracket, 1.00 percent is 50 mg of material leaving the solid. Under vacuum there is no convection to carry that away, so it stays in the volume until it finds a cold wall, and what it leaves there is often a transparent film a few tens of nanometres thick. A film that thin does not show in inspection and does change contact resistance and optical transmission, which is why the requirement exists in the first place.
Where the mass on a board actually comes from
The laminate resin system and the bondply contribute, but they are rarely the largest area. Solder mask covers everything, legend ink sits on top of it, and conformal coating covers both sides. On a 200 x 150 mm assembly, 25 µm of coating on both faces is about 1.5 cm3 of polymer, roughly 1.6 g. One percent of that is 16 mg of volatiles from the coating alone, before the mask, the ink, the adhesives, the labels, the wire insulation and the connector housings are counted.
PTFE is chemically inert, which is why it is popular on RF boards, but the laminate a buyer receives is a composite: PTFE plus ceramic filler plus a bond ply plus copper foil treatment. The composite is what gets tested, and a change of bondply grade between two otherwise identical stacks changes the result. This is the same reason a coating choice can undo a good stack, as covered in coating and RF detuning.
The three ways the limit gets wasted
The first is testing a laminate coupon and calling the assembly qualified. The certificate covers the material as supplied, before drilling, plating, mask, ink and coating. Only a coupon cut from a finished production panel, coated on the same line with the same cure, describes the product you ship. Anything else is a statement about somebody else's process.
The second is treating a bake as a test. Baking at 125 °C does drive volatiles off, and it is required by J-STD-033 before reflow on moisture sensitive parts, but a bake does not produce a pass. It also does not survive storage: the board takes moisture back, which is exactly what the water vapor regained figure measures. A board baked in March and shipped in June is not the board that was tested.
The third is accepting one number for the whole bill of materials. Two coatings from the same family can differ by a large factor in condensable output depending on cure schedule and thickness, and a coating called out by name but cured short of its schedule behaves like a different material. The cure belongs in the requirement next to the product name, not in a process note.
How to write the requirement so it can be met
Name the method and the revision, in most programs ASTM E595. State the two limits, TML at 1.00 percent and CVCM at 0.10 percent. State the sample: a production coupon built through the same process as the flight hardware, not a material sample from the supplier. Say whether water vapor regained has to be reported. Then list the items you want covered, one by one, because a report for the laminate does not cover the coating. If the program runs to ECSS, name ECSS-Q-ST-70-02C, since prime contractors accept it and ESA missions ask for it.
What we hold on a defense build
RF and mixed stacks on Rogers RO4003C, RO4350B and RO4835, Taconic RF-35, TLY-5 and CER-10, and PTFE with plasma treatment before plating, covering 500 MHz to 77 GHz and hybrid RF plus FR-4 where the digital layers need FR-4. Up to 68 layers, board thickness 0.2 to 12 mm, layer to layer registration 0.025 to 0.06 mm, up to seven press cycles, plating 20 µm and above, back-drill stub 0.25 mm maximum. Full parameter detail is on RF and microwave PCB build.
On assembly: seven SMT lines, twelve zone reflow with SAC305 under nitrogen below 500 ppm, bake at 125 °C to J-STD-033, selective coating with the cure verified, X-ray in 2D and CT, cross-section on request, and IPC-A-610 Class 3 where the program asks for it.
SUPERB PCB works as a build-to-print partner here. We do not run ASTM E595 ourselves, and we will not claim a result we did not produce. The test belongs to an accredited laboratory. Our part is to fix the material list with you, keep the per lot laminate certificate, supply coupons that went through the same process as the boards, and hand the laboratory report over with the lot. If an item on your list has no outgassing data, we say so before the panel is ordered rather than after the coating is cured.
Next step
Send the material list, the limit from your specification and the environment the unit sees. We will mark each item as covered by existing supplier data or needing a coupon test, and quote the build with that split visible. Defense and radar assembly detail sits on defense and radar PCBA.