A memory package sits on top of a processor, and the two are joined at the same time the processor is joined to the board. The top row is often 0.4 mm pitch or finer, the bottom ball field may be 0.5 mm, and both have to collapse into a joint in a single pass through the oven. What is unusual is that the second joint cannot be seen from above, cannot be reworked easily, and has no second chance once the paste wets.
Package on package assembly is the part of a build where the stack, not the board, decides the yield.
What a PoP stack adds to a normal build
A standard SMT build places a part, reflows it, inspects it. A stack adds a step in the middle: the top package is picked, dipped in flux, and placed on the bottom package before the pair moves into the oven. From that moment the two packages are one component, and every tolerance on the board now includes the flatness of two bodies stacked on each other.
Four things change at once. The mass the oven sees is doubled at that location. The paste or flux layer between the packages is a fraction of a millimetre thick. The top package has its own warpage, and it moves differently from the bottom one as the pair heats. And the joint that forms is inside the stack, under a body, so the optical station has nothing to look at.
The three parts of a stack, and what each one decides
| Element | What it sets | What to confirm before the build |
|---|---|---|
| Bottom package ball field | Board level joint, standoff height, the coplanarity the top package lands on | Ball diameter and pitch, whether the body is warped at reflow temperature, the keep-out for the top body |
| Inter-package joint | Electrical path between the two dies, and the only joint with no access after reflow | Pad finish on the top of the bottom package, flux type approved for that finish, dip depth tolerance |
| Top package | Stack height, mass, and its own warpage under heat | MSL level, body thickness, ball count, whether it is supplied in a tray that survives the dip step |
Warpage is the defect that hides
Two bodies with different thickness and different copper distribution heat at different rates. At the top of the reflow profile the bottom package may be smiling and the top package crying, and the gap between them closes only at the centre. The joint that forms is fine in the middle and open at the corner, and it passes every check that looks at the stack from outside.
The counter is not a single setting. The soak is held long enough for both bodies to reach the same temperature before the joints collapse, the peak stays inside the window the paste allows, and cooling is controlled so the pair does not lock in a bend. Where the parts are known to be sensitive, a warpage measurement at reflow temperature from the part maker is worth more than any trial on the line.
Flux dip: depth, transfer, and what a shallow dip costs
The dip station sets how much flux reaches the top balls. Too shallow and the outer balls get nothing, which shows as an open at the corner of the top package. Too deep and flux floods the body edge, which shows as a contaminated joint or a blocked keep-out. The depth is set against ball diameter, not against the part outline, and it is checked on the first article and again after any change of top package.
Flux choice is a joint decision with the customer, because the residue sits inside a stack that will never be cleaned. A no-clean flux that leaves a benign residue is the usual answer for a sealed stack. A water soluble flux is only usable if the cleaning step can reach inside, and in most stacks it cannot.
Inspection: what the camera cannot do, and what X-ray can
Optical inspection sees the bottom row at the board edge of the stack and nothing above it. The inter-package row is under a body. Transmission X-ray shows the ball grid as a density map, and a slice through the stack in CT shows whether the top row and the bottom row each formed a joint and where the collapse stopped.
What we report is the void percentage against IPC-7095 and the position of any open or non-wet ball, not a pass mark on the whole stack. A stack with a corner open at the top row is a scrap part in most builds, because the rework path means removing both packages.
How SUPERB PCBA builds a stack
The line runs seven SMT lines with placement to 01005 (0.4 by 0.2 mm) at up to 40,000 CPH, and the stack is placed on the same line that builds the rest of the board, so the panel does not travel between processes with a dipped package on it. Reflow is a twelve zone nitrogen oven at under 500 ppm oxygen with a SAC305 profile, which matters here because a stable soak is what brings two bodies to the same temperature.
Moisture is handled before the parts reach the line. Kits stay in a controlled store, the bag opening time goes on the kit record, and baking runs at 125 C to J-STD-033 where the package and carrier allow it. For a stack this is not optional: a popcorning event inside a stack is not repairable.
Inspection uses 3D X-ray in 2D or CT, with the reporting convention on the void acceptance report page. Where a stack has to come off, the path is on BGA rework and reballing. The moisture side is on component MSL and bake control.
What to send with the stack
Four documents shorten the first article: the stack drawing with both body outlines and the keep-out, the ball count and pitch for each row, the MSL level of both packages, and the approved flux type if the customer has one. A daisy chain sample is better than any drawing, because it lets the first article be checked electrically.
Questions buyers ask
Can a stack be built with two reflows?
No. The top package is placed before the single reflow and joined in the same pass as the bottom row. A second pass would melt the first joint again with nothing holding the stack in place.
Is underfill required?
It depends on the drop and thermal requirement of the product, not on the stack itself. Where the customer calls for it, it is applied after the joint is verified, and it changes the rework path.
Next step
Send the BOM, the Gerber set and the stack drawing. The process note comes back with the dip depth, the profile window both bodies can survive, the inspection plan per row, and the point where the build has to stop and ask the customer.