Most quote delays are not commercial. They are a BOM with no maker names, a Gerber set missing the drill file, or a quantity given as one annual figure with no split by build. Each of those sends the request back with a question, and the clock restarts.
A checklist removes that loop. Twelve inputs cover almost every request, and when all twelve arrive together the quotation comes back in one pass with the assumptions written down instead of guessed.
Why a PCBA quote comes back with questions
A BOM line with only a part number and a description cannot be bought or compared. Two makers can share a number and differ on temperature grade, tolerance or packaging, and the price difference between them is real. Without the maker name and the full ordering code, the buyer has to choose on the customer's behalf, which is the one thing a quotation should never do silently.
Missing process information is the second cause. Surface finish, solder mask colour, board thickness and copper weight change the bare board price more than most buyers expect, and a request that omits them gets a quote based on a default that may not match the drawing.
The third is scope. Test, coating, programming, labelling and packaging are separate operations with separate cost, so a request that leaves them out produces a number that later grows.
The checklist: what to send with the request
| Item | Why the quotation needs it | What goes wrong without it |
|---|---|---|
| Gerber set with drill and outline files | Defines the bare board completely | Stack and panel assumptions that later change the price |
| BOM with maker name and full ordering code | Allows a real purchase position on each line | Substitution decided by the buyer, not the customer |
| Assembly drawing with refdes positions | Separates fitted from unfitted positions | Quoted as fully populated when it is not |
| Approved alternate list, if any | Sets the window for a cross reference | Every alternative becomes a query |
| Board specification | Layers, thickness, copper, finish, mask colour | Price built on a default the drawing contradicts |
| Test scope | Whether ICT, flying probe or functional test is in scope | Test cost appears after the quote is accepted |
| Conformal coating and masking | Material, thickness and keep out areas | Coating quoted at the wrong coverage |
| Programming and firmware loading | Whether the file and the fixture are supplied | Operation omitted from the routing |
| Quantities by build, not by year | Sets the panel utilisation and the setup share | A single annual figure quoted at the wrong volume |
| Component ownership | Turnkey, consigned or a mix | Material cost included twice, or not at all |
| Quality standard and documentation | IPC-A-610 class, inspection reports, traceability | Inspection level discovered at first article |
| Required date and destination | Drives the material release and the shipping method | A plan built backwards from the wrong date |
Ten of the twelve come from the customer; ownership and quality standard are decisions that are easier to make once than to revise later.
What a complete quote returns
A quotation has to be usable in a comparison without a call.
| Line | What it should state |
|---|---|
| Bare board | Unit price at the quoted quantity, with the stack and finish it was priced on |
| Components | Line level cost with the maker and ordering code actually priced |
| Assembly | Per board cost with the number of placements and the sides |
| Test and tooling | One time and per unit, stated separately |
| Lead time | Material lead time and production lead time as two figures |
| Validity and terms | How long the price holds, and which currency and incoterm apply |
Splitting material from production lead time is the single most useful habit in a quotation. It tells the buyer which part of the wait can be shortened by ordering earlier and which cannot.
How SUPERB PCBA handles a quote request
Every BOM is scrubbed before it is priced. Part number, package, tolerance, temperature grade and revision are checked against maker data, and rows that cannot be resolved come back as questions rather than as assumed lines. Where an obsolete or unavailable part appears, a cross reference is prepared with the pin out and the electrical differences stated, and it is used only with written customer approval.
Quotations are built from the same records the build will use, which is why the price and the process agree: seven SMT lines with 01005 placement, 3D SPI, 3D AOI, X-ray at IPC-7095 with voiding under five percent, a seventeen step flow with ten QC stations, and standards held at IPC-A-610 Class 2 and Class 3, IPC-6012, J-STD-020 and J-STD-033, ISO 9001 and ISO 13485. Components carry a 730 day warranty, and material is counted and verified on receipt.
Superb Automation has supported build to print work since 2000, with assembly in Shenzhen and Jiangxi, bare board production in Jiangsu and Zhuhai, and offices in Wuhan and Shenzhen. The line and inspection equipment behind these figures is listed on the PCBA workshop page of the site.
Revisions, alternates and price validity
A revision change after the quote is a new quote. The polite version, where the old price is applied to a new drawing, is how a job becomes unprofitable on both sides.
Alternates should be quoted as options, not as assumptions. A quote that lists the approved part and a second line for the equivalent makes the trade visible, and the customer decides with the numbers in front of them. The verification steps for a drop in part sit under pin to pin cross reference.
Validity matters more than it used to. Component prices move with allocation and currency, so a quote with no stated validity invites a comparison against a price that no longer exists. Thirty days is normal for priced material; bare board pricing can hold longer because it is driven by process rather than by market.
PCBA quote checklist questions
What if the BOM is incomplete on purpose?
Send it as it stands and mark the open lines. A quote with three clearly marked open lines is more useful than a complete quote built on guesses, and it can be revised in one pass when the missing part numbers arrive.
Can a quote be given from a BOM alone, without Gerber?
For material and assembly work, often yes, with the bare board shown as an estimate. The assembly cost depends on placement count and package mix rather than on the artwork, so a BOM plus a refdes count is enough to start. See one stop BOM sourcing.
Should incoming inspection be quoted separately?
It should at least be visible. Counting, marking verification and X-ray are operations with cost, and quoting them as a line lets the customer decide the level rather than inherit an unstated default. The sequence is set out under incoming inspection plan and the material timing under component lead time solutions.
Next step
Send the Gerber set, the BOM with maker names, the quantities by build and the required date. The reply is a line level quotation with the stack, the parts actually priced, material and production lead time shown separately, and any line that could not be resolved listed as a question instead of an assumption.