A kitting service is where a BOM stops being a document and becomes a build. Everything after that point inherits whatever the kit got wrong. A line that opens a kit and finds one reel short has already lost the setup, the paste and the staff time, and the shortage is discovered at the most expensive moment in the schedule.
The work looks simple from the outside: count the parts, bag them, label them. In practice a kit is a set of decisions about revision, quantity, age, moisture state and ownership, and each of them is a place where a build can go wrong quietly and only show up in test.
What a kit has to get right
Revision first. A kit built to the wrong BOM revision is worse than a late kit, because it will assemble cleanly and fail at functional test, or pass and ship with the wrong part inside. Every kit line needs to carry the revision it was picked against, and a change notice has to reach the kit before the pick, not after.
Quantity second. Issued quantity, not ordered quantity. A reel of five thousand does not mean five thousand are usable, and a kit that assumes it does will run short on a line with normal attrition.
Age third. Two reels of the same part can be five years apart in date code. Mixed into one kit, the build inherits the older material without anyone deciding to use it.
Condition fourth. A part taken out of a dry bag for a sample run is no longer in the same state as the rest of the reel. Moisture sensitive parts need their floor life tracked, and the kit is the last point where that record can be attached to the material before it reaches the oven.
Ownership fifth. Where the customer supplies material, the kit is also a handover: what arrived, what was counted, what was damaged, what was left at the end. Without that record, a shortage becomes an argument.
Kitting models and where each one fails
| Model | Who buys the material | Who carries the count and the risk | Where it usually fails |
|---|---|---|---|
| Full kit through the assembly partner | Partner, against the approved BOM | Partner, to the quoted quantity | Substitution without written approval |
| Customer consignment | Customer | Customer owns stock, partner owns handling | Arrival not counted to the shipping document |
| Partial kit, long lead items consigned | Split by line | Split, and rarely written down | Two counting systems, one shortage |
| Free issue to a subcontract build | Customer | Partner handles, customer pays for loss | Attrition rate never agreed in advance |
| Kit only, assembled elsewhere | Customer | Kit provider counts only | Damage after handover cannot be separated |
What a kit document should carry
The paperwork is the part customers audit, and it is cheap to get right once.
| Field | Why it is there |
|---|---|
| BOM revision and change reference | Proves the pick matches the build |
| Line number as it appears on the BOM | Lets a shortage be traced to a line, not a bag |
| Maker and full part number | Separates a substitute from the approved part |
| Quantity issued | The number the build is actually protected by |
| Date code and lot | The only way age is controlled at the line |
| MSL and floor life state | Decides bake before reflow |
| Pack condition on issue | Distinguishes a sealed reel from an opened one |
| Approval reference for any substitute | Makes the change defensible in an audit |
How SUPERB PCBA runs a kit
Every kit is built to a work order, not to a monthly total. Components are counted by X-ray on receipt rather than by label, markings and date codes are compared with maker data, and parts that carry provenance risk are opened and checked. Aged stock is verified for solderability before it is released to a kit, and moisture sensitive parts are baked at 125 C to J-STD-033 and held under ESD S20.20 in an SMT area at ISO 8, 22 plus or minus 3 C and 45 to 65 percent relative humidity.
Shortages are raised against the kit before the line starts, with the line number and the quantity short, so the decision is a schedule decision rather than a surprise at setup. Any pin to pin change is quoted with the approval reference and is not picked without written agreement, and verified lots carry a 730 day warranty.
The build that receives the kit runs seven SMT lines placing down to 01005, 3D SPI on paste volume, 3D AOI plus DIP AOI, X-ray in 2D and CT to IPC-7095 with voiding below 5 percent, twelve zone reflow on SAC305 with nitrogen below 500 ppm, ICT and functional test, across seventeen process steps and ten QC stations under IPC-A-610 Class 2 and Class 3, ISO 9001, and ISO 13485 for medical programs. Because the kit and the build are under the same roof, the count that leaves stores is the count that reaches the line, which is the point of kitting as a service rather than a bagging job.
The recovery route when a line is already short is on BOM shortage recovery, the inspection levels behind the count on incoming inspection plan, and the assembly floor that receives the kit on the PCBA workshop page.
Kitting service questions
What is the difference between kitting and consignment?
Kitting is the act of building and documenting the set for one build. Consignment is who owns the material. A consigned kit is still a kit, and it needs the same count, the same date code record and the same shortage report, otherwise the ownership question has no evidence behind it.
How early should a kit be ready?
Before the line is scheduled, not on the day. The useful rule is that a shortage found a week out can be solved and a shortage found at setup cannot, so the kit is closed and reported ahead of the material issue date.
What happens to material left at the end of a build?
It is counted back in, reported line by line with quantity, date code and pack condition, and not carried to another program without written approval. The method is on excess inventory management.
Can a kit be supplied for a build we assemble somewhere else?
Our kitting is tied to builds we run, because the count is only verifiable when it continues onto our own line. For material supplied to a third party, the honest scope is component sourcing with an inspection record, not a sealed kit.
Next step
Send the BOM with the revision, the build quantity, the assembly drawing, and which lines you intend to supply yourself. The reply comes back as a kit plan: quantity per line with attrition, pack quantities where a full reel is the only option, the inspection level applied on receipt, and the date the kit is closed for the build.