An ESD control plan is the document an auditor asks for first and a production manager writes last. Everyone on the floor wears a wrist strap, the strap is tested at the start of the shift, and still there is no document saying what is protected, to which limit, and what happens when a check fails.
The gap matters because ESD damage is mostly latent. A part that took a discharge during handling can pass the functional test, ship, and fail in the customer's hands three months later. Without a plan, that failure has no explanation and the lot is written off.
What has to be defined before anything is measured
Four definitions come first: the sensitivity of the parts being handled, the boundary of the protected area, the limits that apply inside it, and the person accountable for each check. Everything else in the plan is a record of those four.
Most plans fail at the boundary. The area is drawn around the SMT line and stops at the door, while kits are opened, counted and stored outside it. The parts are exposed exactly where the plan does not reach, and every check inside the area passes because nothing happens there.
The elements, and the record each one leaves
| Element | What it fixes | Record |
|---|---|---|
| Area boundary | Where the limits apply, marked on the floor and at the door | Area map with the entry points |
| Grounding | Every conductive surface held at one potential | Continuity check with the ohm value and the date |
| Personnel grounding | Wrist strap and footwear checked before work | Daily test log by person and station |
| Worksurfaces and flooring | A dissipative path from every bench to ground | Resistance check at a stated interval |
| Ionization | Charge on insulators that cannot be grounded | Balance and decay check after each service |
| Packaging and handling | Parts stay protected outside the area | Bag type and seal record per kit |
| Training | People know what the limits mean in practice | Training record with the date and the level |
| Audit | The plan is checked as a system, not only as checks | Report with findings and closure dates |
The numbers a plan has to carry
A plan without numbers is a policy. The values that make it auditable are few: the wrist strap system checked to under 3.5 x 10^7 ohm, worksurfaces held between 1 x 10^6 and under 1 x 10^9 ohm, ground connections verified as a low resistance path to the earth point, and the humidity of the area kept inside the range the plan states.
Those limits come from ANSI/ESD S20.20 and the standards it points to, and the plan should name the revision it is written against, because the test methods change between revisions. A plan that cites no revision can be argued with but not audited.
Where a plan breaks in practice
The first break is a handover. Incoming parts are counted outside the area, kits are staged on a bench that is not grounded, and a returned unit is opened at a desk in the office to read the label. Each of those is normal work the plan does not cover.
The second is the insulator that cannot be tested. Tape, foam, bubble wrap and plastic bags hold charge that a wrist strap cannot remove, and passing them over an open board is the most common route for a latent failure to enter a build. Ionization at the station, or keeping the board covered, removes the risk without slowing the work.
The third is drift. A grounded bench is checked once at installation and never again, while the cable beneath it is kicked loose within a month. The check interval is what turns a one-time installation into a control.
How SUPERB PCBA applies its ESD plan
Assembly runs in a 5,000 square metre protected area, with the SMT floor held at ISO 8 cleanliness, 22 plus or minus 3 C and 45 to 65 % relative humidity, with personnel grounding, dissipative worksurfaces and ionization at the stations that handle bare boards. Checks are logged per station, and a failed check takes the station out of use instead of being noted and passed.
Incoming parts are handled inside the area, counted by X-ray rather than opened, and stored in packaging that matches the sensitivity of the part. Kits for RF, medical and military builds stay inside the area between picking and the line, so the boundary covers the whole route a part travels.
The build runs seven SMT lines with 01005 placement, 3D SPI after print, 3D AOI after reflow and X-ray to IPC-7095 with voiding under five percent, through a seventeen step flow with ten QC stations under IPC-A-610 Class 2 and Class 3, with ISO 9001 and ISO 13485 for medical work. The plan sits under ANSI/ESD S20.20 and is audited with the rest of the quality system, so the limits and the checks are reviewed together.
PCBA ESD control plan questions
Is a wrist strap enough to satisfy a plan?
No. The strap protects the discharge path of one person and nothing else. Worksurfaces, flooring, packaging, ionization and the boundary are separate elements, each with its own limit and its own record. A plan that lists only a strap fails the first audit that reads it.
How often do the checks have to run?
Personnel grounding daily, worksurfaces and flooring at the interval the plan states, ionization after each service, and the audit at a fixed period. The interval is a decision the plan makes and then keeps, not something the auditor supplies. The standard behind the limits is summarised under ANSI/ESD S20.20.
What happens when a part arrives without ESD packaging?
It is treated as exposed. The part is handled at a protected station, checked and repacked before it enters the kit, and the fact is written on the incoming record, because a part that arrived unprotected is a risk to every unit that kit builds. How the inspection side is set out is covered under incoming inspection plan.
Next step
Send the parts you handle and the sensitivity levels you hold for them, or send the ESD section of your supplier questionnaire. The reply returns the elements your plan is missing, the limit to state for each, and the records an auditor will ask to see. For the handling side after assembly, see component quarantine, hold and release.